The Heavy Duty EA-82-200 4-stroke, 82-cc Two Man Operated Earth Auger with 8inch (20.32 cm) Auger Bit – the ultimate solution for all your drilling needs. Crafted with exceptional durability and power, this auger is designed to tackle the toughest terrain with ease. Powered by a robust 82-cc engine, this two-man operated auger delivers exceptional performance, allowing you to effortlessly drill through soil, sand, and even hard-packed earth. The 8-inch (20.32 cm) auger bit ensures efficient, high-volume removal of material, saving you time and effort on every project. Built to withstand the demands of professional use, this earth auger features a sturdy construction that can handle the most challenging conditions. With its ergonomic design and vibration-reducing technology, you can work for extended periods with comfort and control. Whether you’re installing fence posts, planting trees, or digging foundation holes, the Heavy Duty EA-82-200 4-stroke, 82-cc Two Man Operated Earth Auger with 8inch (20.32 cm) Auger Bit is the reliable and powerful tool you can trust to get the job done right.
Features
- Heavy Duty Build Quality
- Excellent Digging Capability
- Easy to Operate & Maintain
Specifications
| Brand | Latson |
|---|---|
| Power | 3.5 kW (3.8 HP) |
| Weight | 15.8 kg (Approx.) |
| Fuel Used | Petrol |
| Displacement | 82 cc |
| Stroke | 4-stroke |
| Engine Model No. | 144Lt |
| Engine Type | Single Cylinder |
| Cooling Type | Air-cooled |
| No. Load Speed | 10000 RPM |
| Bit Diameter | 8 inch (20.32 cm) (Approx.) |
| Bit Length | 80 cm (Approx.) |
| Engine Oil Capacity | 200 ml (10W30/20W40) |
| Fuel Tank Capacity | 1500 ml |
| Fuel Consumption | 700 ml/hr (Approx.) |
| Capacity | 90 – 100 holes in 1L Petrol |
| Machine Weight | 12 kg (Approx.) |
| Bit Weight | 3.8 kg (Approx.) |
Applications
- Used to dig in different kinds of soil.
Usage
Before you start:
> Fill the tank with unleaded petrol. No 2T oil needed, there is a separate chamber for pouring the engine oil (20W40).
> Wear the necessary safety items like boots, gloves, etc for protection.
> Attach the appropriate auger bit for the desired hole size.
Starting the machine:
Operator 1:
– Check fuel level and ensure the fuel line is properly connected.
– Set the choke to the “choke” position.
– Prime the engine by pumping the primer bulb if necessary.
– While firmly holding the pull cord, pull it briskly to start the engine.
– Once the engine starts, slowly transition the choke to the “run” position.
Operator 2:
– Gradually increase the engine throttle to engage the auger into the ground.
– Maintain a firm grip on the handles and use body weight to push the auger down.
> Both operators should work together to maintain a steady pace and control the direction of the hole.
> Use the depth markings on the auger to reach the desired hole depth.
> Now, gently guide the auger bit into the ground, applying slight downward pressure to initiate drilling.











Reviews
There are no reviews yet.